-
Custom Stainless Steel Clip
Description: Custom stainless steel clip, Stainless steel clip, Steel flat spring, Stainless steel flat spring clip, Spring steel flat spring.
Send Email Details
Technical information:
1. Spring steel + Heat treatment + Zinc/Copper plating
2. Stainless steel + No surface
Engineering difficulty:
1. Good surface, without any burrs
2. Good elasticity
Remarks:
1. Tooling time: 12 working days
2. Production time: 13 working days -
Flat Spring Steel Clips
Description: Flat spring steel clips, Flat metal clip, Flat spring steel clips, Small metal flat spring clip, Flat clip spring clip, Custom flat clip.
Send Email Details
Technical information:
Material: Spring steel
Finish: Heat treatment + Passivation+ Zinc plating
Engineering difficulty:
1. Pass 72 hours salt spraying testing
2. Can stand strong strength
Remarks:
1. Tooling time: 10 working days
2. Production time: 13 working days -
Flat Metal Spring
Description: Flat metal spring, Steel spring flat.
Send Email Details
Technical information:
1. Material: Spring steel.
2. Surface treatment: Zinc Plating
3. Process: Progressive Stamping --- Heat treatment --- Zinc plating
Engineering difficulty:
1. Shape is complex, made progressively in one stamping machine.
2. Number code are made by stamping too.
3. No deformation after the wings are flipped over 150 times when standing 120KG weight.
Remarks:
1. Tooling time: 14 working days
2. Production time: 12 working days
3. Usage: Switches / Air freshener / battery charger -
Stainless Steel Spring Clip
Description: Stainless steel spring clip, Steel spring flat.Technical information:1. Material: Stainless steel.2. Surface treatment: None3. Process: Progressive Stamping --- DegreasingEngineering difficulty:1. Shape should be exactly round.2. Structure is complex.3. precision only accept +/-0.08mm tolerance.Remarks:1. Tooling time:18 working days2. Production time: 16 working days3. Usage: Automotive / Energy / AerospaceSend Email Details -
Spring Flat
Description:Spring flat, Flat spring clip.
Send Email Details
Technical information:
1. Material: Spring steel
2. Surface treatment: None
3. Process: Progressive Stamping --- Degreasing
Engineering difficulty:
1. Structure and shape is complex.
2. All the 12 wings should be parallel on the horizontal vertical direction.
3. No deformation after the wings are flipped over 300 times.
Remarks:
1. Tooling time: 13 working days
2. Production time: 13 working days
3. Usage: Automobile / Heavy Equipment -
Steel Washer
Description: Steel washer, Stainless steel washer.
Send Email Details
Technical information:
1. Material: Stainless steel
2. Surface treatment:None
3. Process: Progressive Stamping --- Degreasing
Engineering difficulty:
Customized dimension, low unit price
Remarks:
1. Tooling time: 10 working days
2. Production time: 12 working days
3. Usage: Air Monitor / toothbrushes





